|
|
|
 |
| |
|
CONCAST group has embarked
upon plans to install "
Integrated Steel Plant " to
produce Steel Billets right
from the Iron Ore. This
would assist the group to
have dynamic equilibrium
with the market to enhance
group turnover and profits.
In conjunction with State
Government's plans, the
group has acquired about 100
Acres of land at Bankura for
setting up conglomerate of
industries to fructify the
plans. |
|
|
|
 |
|
|
|
CBIL is the first of the
group's unit in Bankura to
produce 200 TPD of Sponge
Iron from the Iron Ore and
local Coal. This Direct
Reduction Process would
enrich the Iron content of
the Ore from 65% to about
85% at the lowest cost.
The Sponge Iron produced is
readily marketable. However,
in the CBIL the Sponge Iron
with other ingredients shall
produce Steel in the two
8.5 MT Induction Furnaces. The
Molten Steel from the
Induction Furnaces shall
further produce 60000 MT per
annum of Steel Billets
continuously through Concaster.
This unit would
also produce special steels
for valuable customers.
The hot gases from DRI shall
produce 4 MW of waste gas
Power for captive
consumption. |
|
|
|
|
|
|
|